[1] Domis D, Trapp M. Integrating safety analyses and component-based design[C]// Proceedings of the 27th International Conference on Computer Safety, Reliability, and Security. 2008:58-71.
[2] Lauer C, German R, Pollmer J. Fault tree synthesis from UML models for reliability analysis at early design stages[J]. ACM Sigsoft Software Engineering Notes, 2011,36(1):1-8.
[3] 刘江. 基于故障树的通用航空器故障诊断专家系统研究[D]. 广汉:中国民用航空飞行学院, 2011.
[4] Nguyen T P K, Beugin J, Marais J. Method for evaluating an extended fault tree to analyse the dependability of complex systems: Application to a satellite-based railway system[J]. Reliability Engineering & System Safety, 2015,133:300-313.
[5] 高顺川. 动态故障树分析方法及其实现[D]. 长沙:国防科学技术大学, 2005.
[6] 高僮. 基于动态故障树和蒙特卡洛仿真的列控系统风险分析研究[D]. 北京:北京交通大学, 2014.
[7] 刘磊. 软件时序故障树建模与分析技术研究[D]. 长沙:国防科学技术大学, 2011.
[8] Magott J, Skrobanek P. Timing analysis of safety properties using fault trees with time dependencies and timed state-charts[J]. Reliability Engineering & System Safety, 2012,97(1):14-26.
[9] Magott J, Skrobanek P. A method of analysis of fault trees with time dependencies[C]// Proceedings of the 19th International Conference on Computer Safety, Reliability and Security. 2000:176-186.
[10]Pillay A, Wang Jiakun. A risk ranking approach incorporating fuzzy set theory and grey theory[J]. Reliability Engineering & System Safety, 2003,1(10):23-25.
[11]李金虎. HXD1型机车在线诊断及评估系统的研究与应用[D]. 长沙:中南大学, 2011.
[12]An Min. Risk assessment in railway safety management[J]. International Journal of Engineering and Technology, 2007,14(1):45-56.
[13]Peng Zhaoguang, Lu Yu, Miller A, et al. Risk assessment of railway transportation systems using timed fault trees[J]. Quality and Reliability Engineering International, 2014,32(1):181-194.
[14]陈志航,黄武超,李中良. 舰艇编队网络一体化反潜作战体系研究[J]. 舰船电子工程, 2010,30(8):1-3.
[15]焦尚. 混装型地空导弹武器系统总体设计[D]. 成都:电子科技大学, 2008.
[16]刘侃,田鑫鑫. 便携式防空导弹武器系统可靠性分析与设计[J]. 电子产品可靠性与环境试验, 2011,29(3):14-17. |