[1] Lei Deming. A genetic algorithm for flexible job shop scheduling with fuzzy processing time[J]. International Journal of Production Research, 2010,48(10):2995-3013.
[2] Lei Deming. Co-evolutionary genetic algorithm for fuzzy flexible job shop scheduling[J]. Applied Soft Computing, 2012,12(8):2237-2245.
[3] Palacios J J, González-Rodríguez I, Vela C R, et al. Coevolutionary makespan optimization through different ranking methods for the fuzzy flexible job shop[J]. Fuzzy Sets and Systems, 2015,278:81-97.
[4] Wang Ling, Zhou Gang, Xu Ye, et al. A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem[J]. International Journal of Production Research, 2013,51(12):3593-3608.
[5] Palacios J J, González M A, Vela C R, et al. Genetic tabu search for the fuzzy flexible job shop[J]. Computers & Operations Research, 2015,54:74-89.
[6] Gao Kaizhou, Suganthan P N, Pan Q K, et al. An effective discrete harmony search algorithm for flexible job shop scheduling problem with fuzzy processing time[J]. International Journal of Production Research, 2015,53(19):5896-5911.
[7] Wang Shengyao, Wang Ling, Xu Ye, et al. An effective estimation of distribution for the flexible job-shop scheduling problem with fuzzy processing time[J]. International Journal of Production Research, 2013,51(12):3778-3793.
[8] Xu Ye, Wang Ling, Wang Shengyao, et al. An effective teaching-learing-based optimization algorithm for the flexible job-shop scheduling problem with fuzzy processing time[J]. Neurocomputing, 2015,148:260-268.
[9] Lin Jian. A hybrid biogeography optimization for the fuzzy flexible job-shop scheduling problem[J]. Knowledge-Based System, 2015,78(C):59-74.
[10] Wang Xiaojuan, Gao Liang, Zhang Chaoyong, et al. A multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem[J]. International Journal of Computer Applications in Technology, 2012,45(45):115-125.
[11] Wang Xiaojuan, Li Wenfeng, Zhang Ying. An improved multi-objective genetic algorithm for fuzzy flexible job-shop scheduling problem[J]. Internatinal Journal of Computer Applications in Technology, 2013,47(2/3):280-288.
[12] Zheng Youlian, Li Yuanxiang, Lei Deming. Multi-objective swarm-based neighborhood search for fuzzy flexible job shop scheduling[J]. The International Journal of Advanced Manufacturing Technology, 2012,60(9):1063-1069.
[13] Deb K, Pratap A, Agarwal S, et al. A fast and Elitist multiobjective genetic algorithm: NSGA-II[J]. IEEE Transactions on Evolutionary Computation, 2002,6(2):182-197.
[14] 赵诗奎,方水良,顾新建. 基于极限调度完工时间最小化的机器选择及FJSP求解[J]. 计算机集成制造系统, 2014,20(4):854-865.
[15] Chiang Tsung-Che, Lin Hsiao-Jou. A simple and effective evolutionary algorithm for multiobjective flexible job shop scheduling[J]. International of Production Research, 2013,141(1):87-98. |