计算机与现代化 ›› 2011, Vol. 1 ›› Issue (11): 11-4.doi: 10.3969/j.issn.1006-2475.2011.11.004
• 算法分析与设计 • 上一篇 下一篇
胡 伟
收稿日期:
修回日期:
出版日期:
发布日期:
HU Wei
Received:
Revised:
Online:
Published:
摘要: “1+4”铝热连轧机是一个极其复杂的系统,为了精确地建模预报末机架出口处的板凸度,提出利用延时反馈BP网络对板凸度时间序列的预报方法来实现对铝带板凸度的精确建模预测。通过现场实验,采集大量试验数据,并通过数据分析,利用仿真验证该方法的有效性和优越性。
关键词: 铝热连轧机, 板凸度, 延时反馈BP网络, LM算法, 时间序列预报
Abstract: “ 1+4 ” aluminum hot tandem rolling mill is a complicated system extremely. In order to predict crown of aluminum strip of the finisher delivery more accurately, this paper puts forward a method of timelapse loop BP network to forecast the sequencing crown, and the reconfiguration of BP network is trained with LM algorithm. With a large number of test data gathered by onthespot experiment and analysis, simulation experiment indicates the predictive precision of relative crown(%) of strip can reach 0.01%, effectivenes and superiority is proved.
Key words: aluminum strip hot tandem rolling mill, crown of strip, timelapse feedback BP network, LM algorithm, prediction of sequence
胡伟. 基于反馈BP网络的铝热连轧板凸度预报建模[J]. 计算机与现代化, 2011, 1(11): 11-4.
HU Wei. Predictive Model of Aluminium Strip’s Crown at Hot Tandem Rolling Mill’s Finisher Delivery Based on BP Network[J]. Computer and Modernization, 2011, 1(11): 11-4.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.c-a-m.org.cn/CN/10.3969/j.issn.1006-2475.2011.11.004
http://www.c-a-m.org.cn/CN/Y2011/V1/I11/11